St. Johns Church

This project entailed the construction of a classroom wing with a chapel / multi purpose room, and administrative areas. We completed casework for all ten classrooms,as well as counters and cabinets for the administrative areas. A key portion of the project was to clad the entry corridor outside the multi purpose room / chapel, and key walls inside the chapel area. The maple veneer was made to pass over entry doors (both sides) and bi-folding doors at the head of the chapel room, without sequence breaks. Our engineering department laid out the entire panel sequence prior to purchasing the veneer. Our finishing department pre-finished all of the paneling in our shop. This was an AWI certified project.

Return to school page (210x30)